
Mortar 10
January 7, 2022
Siporex
January 7, 2022Elektrikergips
This product is an excellent fit for quick fixing of electric tubes, electric doses and other assembly parts. Elektrikergips is poured out in clean water. Ready mixed material can be processed in about 8 minutes.
Preparation and Application
Application time after mixing with water | 7 min. |
---|---|
Drying time | 24 h. |
Application layer thickness | 3-5 mm |
Granules | 0-0.7 mm |
Consumption | 4-5 kg/m² |
Air and surface temperature | +5/+35 °C |
Color | |
Kg. Sack | 2.5 |
Bags/Pallet | 300 |
Related products
-
Stirokol white
CHF 0.00 -
Perl
CHF 0.00 -
Poflex 3
CHF 0.00