
Dimpled Membrane
January 8, 2022
XPS
January 8, 2022Betoncontact
It is laid on internal and external smooth concrete surfaces. Pobetoncontact is ready for use. Before applying it is strongly recommended to mix the product well and add 10% clean water. It is laid manually using a cylindrical roller. Drying time is 12 hours.
Preparation and Application
Application time after mixing with water | 2 h. |
---|---|
Drying time | 12 h. |
Application layer thickness | 1-2 mm |
Granules | 0-1.2 mm. |
Consumption | 350 gr/m² |
Air and surface temperature | +5/+25 °C |
Color | |
Kg. Sack | 10/20 |
Bags/Pallet | 60/36 |
Related products
-
Poputzgrund
CHF 0.00 -
Potiefgrund
CHF 0.00 -
Pocolor Primer
CHF 0.00